The central laboratory for science and technology at general hospital explored using PDCA cycle in the biological safety training of educating medical science graduate students
and then analyzed the effect of training.The laboratory applied the PDCA cycle (Plan- Do- Check- Act) into the bio-safety training practice according its self-characteristic. The 4 links of bio-safety practice including the biological safety factors
training plan implementation
training effectiveness evaluation and problems feedback were integrated with 4 processes of PDCA cycle; In view of the problems existing in the laboratory biosafety training
the PDCA cycle model was applied to biosafety training. Though the PDCA cycle
the central laboratory could establish a biological safety quality monitoring mechanism and achieve the systematization
standardization and normalization of biological safety training.